top of page
Deer River 3.jpg

Deer River Hatchery Bridge Replacement

Timeline:       2019 - 2021
Location:       Havelock, Ontario
Description:

The Deer River Hatchery Bridge Replacement included detouring of traffic to accommodate full road closure; remove existing two-span, single lane steel superstructure; removal of the existing concrete abutment and wingwalls; installation of rock anchors and footings, installation of reinforcing concrete abutments and wingwalls, and the assembly and placement of a prefabricated modular bridge.

Deer River 2.jpg
PXL_20210628_160215657.jpg
Deer River.jpg

About Us

Services

Projects

Our Team

(905) 875-4884

842 Nipissing Rd Unit 2 
Milton, ON L9T 4Z9

Excellence, Integrity, Quality, Passion         ©2021 by HugoMB Contracting.

bottom of page