top of page
20190710_073051.jpg

WASAUKING SWING BRIDGE EMERGENCY REPAIRS

Timeline:       2019 to 2019
Location:       Parry Sound, Ontario
Description:

The Wasauksing Swing Bridge project consisted of emergency repairs to the timber piling for the causeway on either side of the bridge. Work included underwater grouting, sectional timber repairs and replacements, roadway repairs.

About Us

Services

Projects

Our Team

(905) 875-4884

842 Nipissing Rd Unit 2 
Milton, ON L9T 4Z9

Excellence, Integrity, Quality, Passion         ©2021 by HugoMB Contracting.

bottom of page